% Figure 6: why the square root appears (conceptual error model, after division by the signal). \input{figures/figstyle} \begin{figure}[tbp] \centering \begin{tikzpicture}[fig] \begin{axis}[ width=110mm, height=54mm, xmin=0, xmax=4, ymin=0, ymax=6.5, axis lines=left, xlabel={$t=m/\sqrt x$}, ylabel={error$/\sqrt x$}, xtick={0,1,2,3,4}, ytick={0,1,2,3,4,5,6}, tick label style={font=\small}, label style={font=\small}, clip=false] \addplot[figmid, line width=1.1pt, densely dashed, domain=0.16:4, samples=120] {1/x}; \addplot[figdark, line width=1.1pt, dashdotted, domain=0:4] {x}; \addplot[black, line width=0.9pt, dotted, domain=0:4] {1}; \addplot[black, line width=1.6pt, domain=0.2:4, samples=160] {1/x+x+1}; % direct labels instead of a legend \node[anchor=west, font=\footnotesize, text=figmid] at (axis cs:2.75,0.62) {$x/m$}; \node[anchor=west, font=\footnotesize, text=figdark] at (axis cs:3.55,3.25) {$m$}; \node[anchor=west, font=\footnotesize] at (axis cs:4.05,1) {$\sqrt x$}; \node[anchor=west, font=\footnotesize] at (axis cs:4.05,5.25) {sum}; \fill (axis cs:1,3) circle (2pt); \draw[black!70] (axis cs:1,3) -- (axis cs:1.7,5.6) node[anchor=south west, font=\footnotesize, text=black] {minimum near $m\approx\sqrt x$}; \end{axis} \end{tikzpicture} \caption{Why the square root appears (conceptual model, in units of $\sqrt x$ after division by the signal; $t=m/\sqrt x$). The level $\sqrt x$ comes from the dropped characters through (A); the tower brings the fixed cost $x/m$ down to it. The rising branch comes only from a buffer term ($B_0\propto m$ in the bounds as written) whose necessity we do not know, so the position of the minimum is not claimed to be optimal (\S\ref{subsec:ledger}). Density factors, constants and $x^{O(\varepsilon)}$ are omitted.} \label{fig:sqrt} \end{figure}